Water treatment plant build at Laverton, WA goldfields

Design-and-construct contract for a permanent electrodialysis reversal treatment plant at Beasley Creek, Laverton. Compulsory briefing 7 Oct.
The details:
- Owner: Water Corporation (WA)
- Reference: WC7000015533
- Where: Laverton, Goldfields-Esperance, Western Australia
- Closes: November 3, 2026, 2:30 PM Perth time
What to know before you bid:
- Scope: a design-and-construct contractor to deliver a permanent EDR water treatment plant and supporting infrastructure at Laverton, a remote gold-mining town.
- Bid documents are issued only to firms registered as Water Corporation suppliers or bidders through its supplier portal; HSE prequalification to Tier 1 is required and can take up to five working days.
- A compulsory bid briefing and site inspection runs at 10am WST on 7 October at the Laverton treatment plant; interest must be emailed to the contract contact by 10am WST on 6 October, and missing it may exclude a bidder.
- The notice flags Aboriginal participation requirements as applicable.
- Submit electronically through Tenders WA before the 2:30 PM Perth close on 3 November; contact is the named Water Corporation procurement officer.
Notice checked on October 5, 2026. Dates, addenda and requirements can change, so confirm them in the official documents before you bid.